Guodian Guigang Baihuashan Phase I Wind Power Project

Guigang Baihuashan Phase I Wind Power Project has a total installed capacity of 80 megawatts, with 32 sets of 2.5 megawatt wind turbines installed, which can supply 150000 ordinary households with electricity throughout the year, saving over 50000 tons of standard coal annually.

 

Products supplied by Taikai:
110kV fabricated substation
35kV wind power Fahrenheit substation
1 set of online monitoring CM3000
1 set of auxiliary control system AM6000