Beijing Winter Olympics

    The 2022 Beijing Winter Olympics is the first "Green Power Winter Olympics" in the world, with 100% of all venues using green power. Our company has participated in the key projects of green power transmission, such as "Zhangbei Flexible DC Transmission Project" and "Fengning Pumped Storage Project", and received a thank you letter from China National Grid Corporation in the electricity protection service.

 

Products supplied by Taikai:
◆ ± 535kV DC circuit breaker
550kV GIS
126kV GIS
110kV power cable and accessories
35kV GIS
35kV transformer
Unmanned Aerial Vehicle Intelligent Patrol Vehicle
TK-650 phase change heat storage equipment

Taikai Group Co.,Ltd

taikai

TEL:+86-0538-8518280

taikai

E-MAIL:taikaijituan2021@163.com

taikai

ADD:No. 599, Zhongtianmen Street, High-tech. Zone, Tai’an, Shandong

taikai

Taikai Group

Business license
taikai

Campus recruitment


2023 Taikai Group Co.,Ltd      ICP17005809号-1       300.cn