+
  • FZB-40.5-1.14-5500新能源华变.jpg

FZB-40.5/1.14-5500 new energy Chinese prefabricated substation


    The product is installed in an open transformer with low temperature rise and low cost. It is applied in the Keyouqianqi 1 million kilowatt projec of CGN which is a major poverty alleviation project approved by the Party Central Committee with the theme of supporting the old revolutionary base.
Contact us